Selected work
Case studies across hyperscale infrastructure, manufacturing, and the built environment.
Six selected programs from a 16+ year delivery career in the U.S. and Brazil.
- 01Data center · hyperscale
Multi-building hyperscale campus
Integrated Design Manager · Aligned Data Centers
2025 — 2026 · USA
Hyperscale campuses don't get strained because any one workflow is hard. They get strained because design, permitting, underground systems, and field execution all move in parallel — and the toughest problems live in the gaps between them.
Women in Construction Week 2026, Aligned Data Centers — on-site at the multi-building campus. · Source ↗ - 02Data center · hyperscale
Hyperscale construction-contracts program
Data Center Construction Contracts — Project Manager focus · Microsoft (CO+I)
2024 — 2025 · USA
Hyperscale data centers are some of the most carbon-intensive structures in modern construction. Microsoft's mass-timber pilot in Northern Virginia is the industry's first serious attempt to change that — a hybrid cross-laminated timber, steel, and concrete design targeting 35% less embodied carbon than steel and 65% less than precast concrete.
Microsoft Data Center Delivery — Blueridge regional team (Dec 2024). · Source ↗ - 03Industrial · manufacturing
Industrial & R&D facilities portfolio
Technical Project Manager — Industrial & Workplace Projects · Tesla
2023 — 2024 · USA
The Lathrop Megafactory is the world's first dedicated facility for mass-producing Tesla Megapacks and North America's largest utility-scale battery plant. My time at Tesla overlapped its publicly announced doubling — from 20 to 40 GWh of annual production capacity.
Introduce a Girl to Engineering Day 2024 · Tesla Megafactory, Fremont — STEM-mentorship volunteer initiative. · Source ↗ - 04Retail · large-scale
Passeio das Águas Shopping
Design & Construction Manager · Aliansce Sonae Shopping Centers
2013 · Brazil
Passeio das Águas, developed by Sonae Sierra Brasil, was the largest shopping center in Brazil's Central-West region when it opened on 30 October 2013: 267 stores, 78,000 m² of gross leasable area, 4,000 parking spaces and an investment of about €150 million. It was a ground-up project I delivered from construction through commissioning and into ongoing tenant operations.
- 05Public transit
Goiânia Bus Rapid Transit network
Project Design Manager · Goiânia Bus Rapid Transit network
2019 — 2021 · Brazil
The Bus Rapid Transit corridor runs through the dense center of Goiânia, Brazil's tenth-largest city — a public-infrastructure program that had to reach functional opening while threading construction through active urban fabric.
On the newly-paved BRT corridor with the project team, Goiânia — during the 2019–2021 design-management engagement. - 06Healthcare
Healthcare planning & design
Architectural Designer (Healthcare Design) · Array Architects
2022 · USA
Our Lady of Lourdes Hospital in Camden, NJ (Virtua Health): a six-floor patient and clinical tower addition of about 245,000 sq ft and about 160,000 sq ft of renovation, valued at about $225M.